The plant at Halol is built over 121 acres of land with provision for second line. For the current 600TPD plant, HNG Float has tied up with M/s Toledo Engineering Company (TECO), USA for basic engineering, design services, project engineering and complete project management including procurement management, engineering management, project services and onsite job assistance during the installation, commissioning and start up of the Float Plant. TECO has the expertise of making long lasting and energy efficient float furnaces. They have made more than 55 float plants around the world.

The project was started on 30th Jan 2008 with the foundation laying ceremony and completed on 30th Nov 2009, in a record time of 22 months.

HNG Float has tied up with renowned international suppliers for design, equipment and installation of:-

Tin Bath Merkel (USA) and EFCO
Annealing Lehr CNUD (Belgium)
Inspection ISRA (Germany)
Cutting Bottero (Italy)
Packing Bystronic (Switzerland)